Target
The Target tab has two chapters. “The target”: its code and description. “Components”: the files, tables or sets of tables of the target; each component can break down into sub-components. Each code carries a mandatory prefix, shown in front of the field: “T-” for the target, “S-” for a source, “LB-” and “TB-” for the blocks; a component takes “T-{target}-” or “S-{source}-”, updated if the target or the source changes code. You only enter the rest. In French the same objects are shown as C-, S-, BC-, BT- and A-: the input stays the same, only the prefixes follow the screen language. A component that starts empty is declared by choice, with its reason: it is no longer an anomaly but stays visible in orange in the Check.
Sources
Add each source, then its components; each component can break down into sub-components. A source component that no TB uses is an anomaly: either a TB is missing, or it is not migrated, and it is declared by choice with its reason; a whole source can be declared not migrated. A choice stays visible in orange in the Check and becomes an anomaly again if a TB still migrates the component. A source, a TB or an LB without a description is flagged in grey, to document.
Transformation
A transformation block (TB) links source components to target components. The tab opens as soon as there is one component in the target and one in a source. The summary lists the TBs, then “Add a TB”; one page per TB, face to face: source components on the left, target components on the right, ticked on the spot, each box saved immediately. A TB without a source side or without a target side is an anomaly.
Load
A load block (LB) groups the target components that are built together. The tab opens as soon as the target has a component; the summary lists the LBs, then “Add an LB”; one page per LB.
You tick the components carried; a choice that would put the same component twice in a block, directly or through the component that contains it, is greyed out with its reason.
How we migrate: target constraints
The second tab, “How we migrate”, opens as soon as there is an LB. As in the what, you first set, then read: Target constraints and Source constraints are for entry, Sequencing gives the outcome, Export the status report.
In “Target constraints”, for each target component loaded by an LB, you tick the target components it needs: no policy without a policyholder, no premium notice without a policy. A component without a prerequisite is declared “depends on nothing”. A sub-component depends on the component that contains it and inherits its dependencies, with nothing to enter. Whatever would create a cycle is greyed out.
How we migrate: sequencing
“Sequencing” computes the loading order from the what and the constraints. LB-A runs before LB-B if a component loaded by B depends on a component loaded by A; wave 1 groups the LBs without prerequisites; each TB is placed just before the wave of the first LB it feeds; the critical path, the longest chain of LBs, is highlighted. As long as components remain to be declared, the sequence is provisional.
The written summary flags LBs waiting for each other (cycle), a dependency on a component that no LB loads or that starts empty, a TB that feeds several waves, and the points drawn from the sources: different cut-offs, delta catch-ups, preparations. A cited object leads to the page where it is corrected; anomalies are counted in “Target constraints”, where they are corrected. None of this counts in the Check of the what.
How we migrate: source constraints
The “Source constraints” sub-tab is browsed by type of constraint, each with its own entry, and nothing is mandatory:
- Cut-offs: a cut-off (“CO-”) groups the sources extracted at the same moment; a TB that reads sources from several cut-offs, or sources without a cut-off, is to confirm; each wave shows the cut-offs it needs;
- Frozen or live: whatever a live source feeds needs a delta catch-up after its wave;
- Prior preparation: a source component to prepare before migration (cleansing, deduplication, volume, access through a third party…), with its reason; a TB that reads it waits for it, and the preparation becomes critical if this TB prepares a wave on the critical path.
These points are to confirm, never anomalies; they appear in the “Sequencing” summary, “Sources” section.
Check
Anomalies are counted in the summary of their tab and on the tab itself; you correct them in any order. A greyed-out tab says what is missing to open it, and leads there.
The Check tab draws the session's mapping as a graph, read from left to right: source components, TBs, target components, LBs. The totals say how many source components are migrated, how many target components are fed and carried by an LB, how many TBs and LBs are complete. In red, the anomalies; in orange, the points to review, which do not count in the tabs because they may be normal choices:
- documented choice: component not migrated, target component that starts empty, source not migrated, with its reason;
- target component not fed, built without migration (entry or creation);
- target component cited by several LBs;
- component loaded or fed twice through a component that contains it: one block cites the whole component, another cites the sub-component;
- merge: target component fed by several TBs or several sources;
- split: source component migrated by several TBs;
- LB built without migration;
- source none of whose components is migrated.
A component folds its sub-components (“+n”); a sub-component cited directly by a block has its own node. Hovering over an object highlights its chain, upstream and downstream; clicking opens its page. Two filters lighten the graph: a source, and “only what is a problem”.
Export
The Excel workbook follows the tabs of the page, in the same order and with the same content: Target, Load, Sources, Transformation, Check for the what; Target constraints, Source constraints, Sequencing for the how. It can be downloaded at any time, as the session stands, anomalies included, in the screen language.
Search
The search field in the banner finds a component, an LB, a TB or a source by its code, physical name or description; Enter leads to the row, which flashes.